This feasibility study carried out to determine suitable trace for the expressway and its feasibility. Road Development Authority (RDA) was the Employer of the project. The project had been consisting of 74km length of expressway. ED&PMC involved geotechnical investigation and technical work of the study as a sub-consultant.
ED&PMC prepared reports and drawings for Highway Designs, Pavement Design, Sutural Designs, Geotechnical Study and BoQ.